Hampton Roads District Weekly Traffic Alert: Nov. 22-28, 2026

News originally published by

Virginia Department of Transportation

All work is scheduled weather permitting. Updated information on work zones and lane closures is available on 511.vdot.virginia.gov.

orange sign with the words road work ahead

** VDOT will suspend many highway work zones and lift most lane closures on interstates and other major roads in Virginia for holiday travel beginning noon, Wednesday, Nov. 25 until noon, Monday, Nov. 30. Read the statewide holiday travel release here.**   

NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.

Scheduled closures are subject to change based on weather conditions and other factors.

For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511 Virginia (511.vdot.virginia.gov), download the VDOT 511 smartphone app, or dial 511.

Bridges and tunnels

Hampton Roads Bridge-Tunnel (HRBT) Expansion Project:

  • Full ramp closures from as early as 7 p.m. to as late as 5 a.m.: 
  • Single-lane closures on I-64 in both directions at HRBT Nov. 22-24 from as early as 9 p.m. to as late as 5 a.m. 
  • Brief, intermittent stoppages on I-64 in both directions between 10 p.m. and 5 a.m.: 
    • Oastes Creek Bridge to W. Bay Avenue Nov. 22-24 
    • HRBT Nov. 23-24 
  • Single-lane closures on I-64 in both directions from HRBT to Willoughby Bay Bridge Nov. 22-24 from as early as 8 p.m. to as late as 5 a.m. 
  • Single-lane closures on I-64 in both directions from Willoughby Bay Bridge to Patrol Road Nov. 22-24 from as early as 7 p.m. to as late as 5 a.m. 
  • Flagging operations on W. Bay Avenue Nov. 23-24 from as early as 7 p.m. to as late as 5 a.m. 

Monitor-Merrimac Memorial Bridge-Tunnel, I-664: 

  • Alternating, single-lane closures in both directions Nov. 23-24 from 9 p.m. to 5 a.m. 
  • Mobile, alternating single-lane closures southbound Nov. 24 from 9 a.m. to 2 p.m.  

James River Bridge, Route 17:

  • Single-lane closure southbound Nov. 23 from bridge to King’s Cove Way from 9 a.m. to noon.  

Elizabeth River Crossings (Downtown/Midtown Tunnels):

  • Go to DriveERC.com for scheduled closures on the Downtown Tunnel (I-264), Midtown Tunnel (Route 58) and MLK Expressway (Route 164).

Interstates

I-64, Norfolk:

  • Full on-ramp closure from Granby Street to I-64 west Nov. 23 from 9 p.m. to 5 a.m.  

I-64, Chesapeake:

  • Full ramp closures from I-64 east to: 
    • I-464 north (exit 291A) Nov. 22-24 from as early as 9 p.m. to 5 a.m. 
    • I-464 south (exit 291B) Nov. 22-24 from 10 p.m. to 5 a.m. 
    • Full ramp closures from I-64 west to I-464 north (exit 291A) Nov. 23-24 from 8 p.m. to 5 a.m

I-64, Gap Widening Segment C, James City County:

  • Single-lane closures on I-64 in both directions from the New Kent County-James City County line to Route 199/Lightfoot (exit 234) Nov. 22-24 from as early as 7 p.m. to as late as 5 a.m.  
  • Flagging operation on Six Mount Zion Road Nov. 23-24 from as early as 9 a.m. to as late as 3 p.m. 

I-64, Hampton Roads Express Lanes (HREL):

  • The Hampton Roads Express Lanes project website contains additional information on the express lanes project-related closures and traffic impacts. (vdot.virginia.gov/projects/major-projects/64expresslanes/news--traffic-alerts/)

  • An interactive map displaying long-term traffic impacts across the various Hampton Roads Express Lanes construction projects can be found at the project website. (vdot.virginia.gov/projects/major-projects/64expresslanes/long-term-traffic-impacts/)

I-64, Norfolk Reversible Express Lanes:

  • Full closure in both directions: 
    • Continuously from 8 p.m. Nov. 20 until 3 a.m. Nov. 23 
    • Nov. 22-24 from 8 p.m. to 3 a.m.    
    • Nov. 23-25 from 9:30 a.m. to as late as 12:30 p.m.    

I-64, Chesapeake Express Lanes:

  • Full Express Lanes closures westbound between the High Rise Bridge and Greenbrier Parkway (exit 289) Nov. 22-25 from 8 p.m. to 5 a.m. 
  • Full Express Lanes closures eastbound between Indian River Road (exit 286) and the High Rise Bridge Nov. 22-25 from 8 p.m. to as late as 5 a.m.  

I-64, HREL Hampton 4C Project:

  • Alternating, single-lane closures on I-64 west on the Willoughby Bay Bridge from 4th View Street (exit 273) to 15th View Street (exit 272) Nov. 23-24 from 9 p.m. to 5 a.m. 
  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265A). 

I-64, HREL Norfolk 1A Project:

  • Alternating single-lane closures on I-64 in both directions from Granby Street (exit 276) to Chesapeake Boulevard (exit 278) continuously from as early as 7 p.m. Nov. 20 to 5 a.m. Nov. 23. (No eastbound work on Nov. 22 between 11 a.m. and 3 p.m.) 
  • Alternating single-lane closures on I-564 from I-64 to Terminal Boulevard:   
    • Eastbound Nov. 22-24 from as early as 7 p.m. to 3 p.m.  
    • Westbound Nov. 22-24 from as early as 9 a.m. to 4 a.m. 
  • Single-lane closures on I-64 east on Willoughby Bay Bridge from 15th View Street (exit 272) to 4th View Street (exit 273) Nov. 22-24 from as early as 9 p.m. to 5 a.m. 
  • Full off-ramp closures from I-564 east to I-64 west Nov. 22-24 from 7 p.m. to 5 a.m. 
  • Full off-ramp closures from I-564 east to I-64 east Nov. 22-24 from 7 p.m. to 5 a.m. 
  • Full off-ramp closures from I-64 west to Granby Street (exit 276A) Nov. 22-24 from 7 p.m. to 5 a.m. 
  • Full off-ramp closures from I-64 east to Granby Street/I-564 west (exit 276A) Nov. 22-24 from as early as 7 p.m. to 4 a.m. 
  • Full on-ramp closures from Patrol Road to I-64 east Nov. 22-24 from as early 8 p.m. to 5 a.m. 
  • Full off-ramp closures from I-64 in both directions to Tidewater Drive (exits 277A and 277B) Nov. 22-24 from as early as 8 p.m. to 5 a.m. 
  • Full on-ramp closures on Tidewater Drive in both directions to I-64 west Nov. 22-24 from as early as 8 p.m. to 5 a.m. 
  • Full on-ramp closures from Tidewater Drive in both directions I-64 east Nov. 22-24 from as early as 8 p.m. to 5 a.m. 
  • Full off-ramp closures from I-64 west to Little Creek Road (exit 276C) Nov. 22-24 from as early as 8 p.m. to 5 a.m. 
  • Full off-ramp closures from I-564 east to Little Creek Road (exit 4) Nov. 22-24 from 7 p.m. to 5 a.m. 
  • Full on-ramp closures from Little Creek Road to I-64 east Nov. 22 -24 from as early as 8 p.m. to 5 a.m. 
  • Alternating single-lane closures on I-64 in both directions from Granby Street (exit 276) to Chesapeake Boulevard (exit 279) Nov. 23-24 from as early as 7 p.m. to 5 a.m. 

I-64, HREL, Norfolk 1B Project:

  • Alternating, double-lane closures on I-64 west from I-264 (exit 284) to Chesapeake Boulevard (exit 278) Nov. 22-24 from 7 p.m. to 5 a.m.  
  • Alternating, double-lane closures on I-64 east from Tidewater Drive (exit 277) to Northampton Boulevard (exit 282) Nov. 22-24 from 7 p.m. to 5 a.m. 

I-64, HREL Newport News/Hampton 4A/4B Project: 

I-464, Chesapeake:

  • Full on-ramp closures from Route 17 (Dominion Boulevard) north to I-464 north (exit 17B):  
    • Continuously from 5 a.m. Nov. 22 to 5 a.m. Nov. 23 
    • Nov. 23-25 from 9:30 a.m. to as late as 3 p.m.  
    • Nov. 23-24 from 8 p.m. to 5 a.m. 
  • Full ramp closures from I-464 south Nov. 22-24 from 8 p.m. to 5 a.m.: 
    • I-64 west (exit 1A) 
    • I-64 east (exit 1B) 
  • Full ramp closures from I-464 north to I-64 east (exit 1) Nov. 23-24 from 8 p.m. to 5 a.m

I-264, Portsmouth:

I-564/Intermodal Connector, Norfolk:

  • Full off-ramp closures of the Intermodal Connector west ramp to Seabee Road Nov. 23-23 from 9:30 a.m. to as late as 4:30 p.m.

Other Notable Closures

Route 164 (Western Freeway, Portsmouth:

 

Last updated: November 20, 2026

© Copyright , VDOT. All rights reserved

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

The Virginia Environmentalist

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.